SH PERFORMANCE
At the beginning of the work, we are committed to participating weekly
face-to-face meetings on site. Where do we carry out planning for monitoring of work, projects and delivery/relocation of equipment. The meetings are attended by the commercial and Aztec part of the SH together with those responsible for the contract.
SH SOLUTION
The SH Rio de Janeiro unit presented solutions to overcome the challenges
of the work. The SH equipment present on site are the usual ones for residential/commercial type works, such as the anchoring family including bars and nuts, type C metal profiles, load towers LTT and, finally, the specific supports for re-shoring. Currently the
The balance at work is approximately 130 tons. Equipment such as anchor bars, nuts and metal profiles are being used to lock the pillars of the work. In the same line, you can also find bars, nuts and metal profiles, now with anchoring claws being used in locking solutions of the beams.
We are using load towers to support the slabs and beams. of the LTT family with solutions using type C metal profiles, with the
primary line with C-12 and the secondary with C-7.5. Due to the project architectural structure of the Temple assume a grandiose character, it is necessary the use of Lume rational struts, some with an extension to contemplate the re-propping of slabs and beams in the double-height section (PDD), with a height of around 5.50 m.