The active presence of SH’s commercial and technical sector throughout the process was essential to guarantee the success and quality of the work, as well as strict compliance with the schedule established by the client.
As it is a robust project, SH needed to use equipment with a higher load capacity than conventional, which was the LTT Extra load tower, also responsible for ensuring high productivity. 190 tons of LTT Extra were used in this project.
With a prior scheduling schedule, SH engineering was in constant contact with the work, coordinating scheduling and requests for the necessary equipment to optimize cost and use of resources. Furthermore, the online system offered by SH, SH Digital, provided a transparent and efficient experience for the customer, allowing detailed monitoring of the process, from issuing invoices to reports on the entry and exit of materials.