In addition to providing Topec ® SH equipment as a solution to the challenge, one of SH’s main actions in this project was to provide comprehensive technical support, including assembly guidance, constant visits and even virtual visits to assist the Rivello Construtora team.
To overcome the challenge, SH recommended the Topec ® SH formwork system, which guarantees agility and ease in assembly, better concrete finishing and greater durability, thus meeting Rivello’s needs.
Construction company in relation to the construction system used.
This solution allows for cleaner, faster and safer work, in addition to significantly increasing productivity. While the national average is 0.3 man hours per square meter, in this project they managed to reach 0.2 man hours per square meter, representing a 50% gain in efficiency.
Therefore, the partnership between Rivello Construtora and SH in the work on the Ilhotas Premiere building was marked by overcoming the challenge of making construction more efficient and productive, with SH playing a fundamental role in providing technical support and a specific solution suited to the needs of the work.