The construction of Boulevard Carneiros presented unique challenges for the team involved. With different modulations in each apartment, the need for an efficient daily concreting cycle and a cantilevered slab on the rooftop, the execution of the work required innovative solutions to ensure productivity and quality.
The Challenge: Complex Modulation and Accelerated Pace
Each unit of Boulevard Carneiros had different modulations, which required meticulous planning to make the best use of the formwork. In addition, the team had to adapt the schedule to maintain an accelerated concreting pace, without compromising quality and structural safety.
Another critical point was the cantilevered slab on the rooftop, which required an efficient shoring solution to ensure stability during execution.
SH Solutions: Technology and Efficiency
To face these challenges, SH provided strategic solutions that enabled an efficient and optimized workflow. Among the main equipment used were:
Lumiform SH®: Formwork system that allowed modularity and intelligent reuse between projects.
Balanced shoring solutions: Essential support for the rooftop cantilever slab.
Specialized technical support: From planning to execution, ensuring that solutions are adapted to the client’s needs.
The SH Difference: Partnership and Commitment
SH stood out not only for the quality of its equipment, but also for its close and specialized service. Technical support was essential for adapting solutions to the project, allowing for better use of materials and ensuring efficiency in the work.
The partnership with DUE Incorporadora has already extended to other projects, demonstrating confidence in SH’s expertise and commitment to civil construction.
Results: Efficiency and Intelligent Reuse
Thanks to the technology and support offered by SH, the Boulevard Carneiros project achieved the following results:
✅ Better use of formwork, reducing waste;
✅ Safe execution of the cantilever slab, ensuring structural stability;
✅ Personalized service, with technical support from planning to post-construction; ✅ Efficient reuse of equipment for future projects.
The partnership between SH and DUE Incorporadora reinforces the importance of innovative and planned solutions to ensure efficiency, safety and productivity in civil construction. With technology, specialized technical support and quality materials, we continue to promote high-performance projects throughout Brazil.
If you are also looking for smart solutions for your projects, count on SH!
Check out the full video of the project HERE!
SH, THE SUPPORT YOUR PROJECT NEEDS!